DongNai: Web portal

https://dongnai.gov.vn


Investment in constructing 5 main traffic axis routes in the next 5 years

 

According to the road transport traffic plan of Dong Nai Province until 2020 and orientation to 2030 (as amended and supplemented), in the period of 2021-2025, the province will have 5 main traffic axis routes constructed.

 


a66.jpg
Provincial road No. 771C (the road connecting to Phuoc An Port) has completed construction, phase 1 at the width of 12 meters.

 

Specifically, 5 main axis routes will be invested and built in the period of 2021-2025, including: provincial road No. 769G (Nhon Trach Inter-port) about 15.2km long; Provincial road No. 771E (extended Belt Road No. 3) is more than 2km long; Provincial road No. 769F (connecting District 2, Ho Chi Minh City with Nhon Trach District) is about 8.5km long; Provincial road No. 768C (Bien Hoa City Belt Road) is more than 17.6km long and provincial road No. 771D (Cai Mep-Thi Vai Inter-port) is more than 1.6km long.

Meanwhile, for the two main axis routes that have been invested and built in the period of 2016-2020, it will also continue to be fully invested and built, including: provincial road No. 771C (the road connecting into Phuoc An Port) about 11km long will continue to be fully invested and built to meet the urban road standards with a building line of 61m width and provincial road No. 777C (specialized road for transporting construction materials) is invested and built with a scale of 2-6 lanes and building line 32m wide. 

Vi Quan

 


You did not use the site, Click here to remain logged. Timeout: 60 second